AI Autopilot — +6% throughput and $781K annual profit gain in a 25-day controlled pilot. Brasil Mineral #441 (Jul 2024).See Pilot Results
ROI Calculator
ROI Calculator
See what specialist AI can save your organization.
Configure your scenario
410 t/h
7,500 h
$5/t
+3%Published pilot: +6%
Your incremental value potential
$461K
Estimated incremental annual value
no CAPEX — the AI runs on your existing equipment
92K
Additional tons per year
+6%
Real-world reference In the 25-day Canadian gold-mining pilot: +6% throughput (435 vs 412 t/h) ≈ 2,694 additional oz/year ≈ $781K incremental annual profit, net of AISC — published in the Brazilian trade magazine Brasil Mineral (#441, Jul 2024).
Calculation assumptions
Annual value = throughput × operating hours × uplift % × incremental margin per ton.
The 3% default uplift is deliberately conservative — the published pilot verified +6% overall (+3% on hard ore, Wi ≥ 14 kWh/t).
Incremental margin per ton varies by commodity, grade, and plant cost structure — adjust it to your reality. For reference, the published gold pilot implied ≈ $4.2 per additional ton, net of AISC.
Results depend on use case and operating conditions. Request a free assessment for a tailored projection.
Want a custom analysis?
Request a free assessment — our team will model the exact ROI for your use case, infrastructure, and scale.